Construction dust, cement haze, paint splatters, and builder debris don't disappear on their own. Professional post-construction cleaning is a specialist job that requires industrial equipment and trained staff — not a regular house cleaner.
Our 3-Phase Process
Phase 1 — Rough Clean
- Remove large debris, offcuts, and packaging
- Sweep construction dust from all floors and surfaces
- Clear waste from inside and outside
Phase 2 — Deep Clean
- Wash all walls and surfaces
- Remove cement haze from tiles and floors
- Clean windows inside and out (cement, paint, film)
- Clean inside all cupboards and storage
- Remove paint spots from floors and fixtures
- Clean light fittings, fans, AC units, and vents
Phase 3 — Final Polish
- Floor polishing (tile, marble, hardwood)
- Final wipe-down of all surfaces
- Bathroom and kitchen deep scrub
- Streak-free window finish
Prices in Ghana
| Property | Cost |
|---|---|
| 2–3 bed apartment | GHS 500 – 1,000 |
| 4–5 bed house | GHS 1,000 – 2,000 |
| Commercial office | GHS 1,500 – 4,000+ |
| Large estate | Custom quote |
How Long Does It Take?
| Property | Duration |
|---|---|
| 2-bed apartment | 6–10 hrs (team of 3) |
| 4-bed house | 1–2 days |
| Large commercial | 2–5 days |
Why Not Just Use a Regular Cleaner?
- Construction dust is ultra-fine and penetrates HVAC systems and electrical fittings
- Cement haze requires specialist descalers — regular mopping won't remove it
- Paint on glass needs specific tools to remove without scratching
- Volume is 2–3x a standard clean — the workload is completely different
Need a Professional Clean in Accra?
SparkClean Ghana serves homes and businesses across Accra, Tema, and surrounding areas.
Book a Free Quote →